QPR ProcessAnalyzer Project Workspace

From QPR ProcessAnalyzer Wiki
Revision as of 08:35, 25 February 2020 by Ollvihe (talk | contribs) (Created page with "Models, datatables, dashboards and scripts are organized into projects. In the Workspace the hierarchy of projects is on the left. In QPR UI, each view and panel is stored to...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Models, datatables, dashboards and scripts are organized into projects. In the Workspace the hierarchy of projects is on the left.

In QPR UI, each view and panel is stored to a folder in a hierarchy of folders. The hierarchy has a root folder named Workspace, which cannot be renamed, moved or deleted. All versions of a view/panel are located in the same folder, and the folders screen shows the latest version number. When opening a view in the folders screen, the latest version of the view is opened. Folders itself don't have versioning.

File:QPRUIFolders.png

Icons in the folders screen:

  • Folders, views and panels have separate icons in the left side of their names.

Opening Views and Folders

To open a view, double-click the view row or select the view and click the Open button. Folders can be opened in the same way, and also by selecting it from the left side folders hierarchy.

Creating Folders and Views

  1. On the left side folders hierarchy select the folder to which you want to create a folder or a view.
  2. Click the New button and click either View or Folder.

Deleting Projects and Dashboards

  1. In the Workspace, either select
    • a single project on the left side hierarchy or
    • multiple projects and dashboads on the right side list to be deleted.
  2. Click the Delete button and click Yes to the confirmation message.

Moving Projects and Views

Projects and dashboards can be moved by dragging them from the right side list to the target project in the left side hierarchy.

Folders can be moved by dragging them from the right side list to another folder in the left side. This requires to open the folder containing the other folder that is to be moved. Currently folders cannot be moved by dragging them from the left side folders hierarchy.

Importing Dashboards

  1. In the Workspace, from the left side projects hierarchy select the project to which you want to import the dashboard.
  2. Click the New button, and select Import.
  3. Select the file to be imported, and the file is imported as a dashboard.

Exporting Dashboards

  1. In the Workspace, navigate to the project where the dashboard to be exported is located and select the dashboard.
  2. Click the Export button and the export file can be downloaded.